info@foreshore.capetown

FAQ's

FAQ's

What is the project about?

The Foreshore Precinct Project proposes a long-term vision to transform Cape Town’s Foreshore from an underused, transport-dominated area into a vibrant, walkable urban neighbourhood.

The intention is to reconnect the city centre with the harbour and create new opportunities for housing, business, public space, transport and economic growth.

The project proposes new transport infrastructure, including the construction of link bridges between Helen Suzman Boulevard and the existing Foreshore freeway and replacing the outbound elevated freeway with an outbound freeway tunnel.

Should these proposals go ahead, it will facilitate the creation of a new mixed-use precinct, including homes, offices, shops, parks and a new harbour-edge promenade.

Why does this project matter?

The Foreshore is strategically located between the Cape Town CBD and the Port of Cape Town. It is about 900 metres from Cape Town Station and 600 meters from MyCiTi service hubs, making it particularly well positioned for transit-oriented development.

The project proposes opportunities to unlock land that will make it possible to expand the city centre towards the harbour; improve traffic flow to and from the CBD and surrounding areas such as the Atlantic Seaboard; create facilities for pedestrians and cyclists; enable better connections between the CBD, the V&A Waterfront, the harbour and surrounding areas, while creating much-needed economic activity.

What will the Foreshore Precinct Project mean for people who live, work and move through Cape Town every day?

For commuters, traffic heading for the V&A or Atlantic seaboard will not funnel through Buitengracht. There will be dedicated bus lanes for MyCiTi buses, and safer pedestrian crossings at key intersections that will turn the area into a more walkable environment.

Then, the intention is also to make it easier and more convenient to get to the Foreshore, and to make it an alluring and pleasant space where people want to spend time.

Expect safer pedestrian crossings, improved priority for public transport services, more walkable streets and a bicycle-friendly environment, new public spaces and parks, and eventually a new neighbourhood with homes, shops and places to work.

The project is ultimately about creating a Foreshore for people, not simply a space for moving vehicles.

Does the project include affordable housing?

Yes, this is included in the proposals.

The proposed new neighbourhood includes a mix of residential uses with units of different sizes to accommodate a wide range of income groups, including affordable housing.

What is planned for the top of the tunnel?

Should the proposed outbound tunnel go ahead, the deck above will become a public space and outdoor promenade for pedestrians and active mobility. The proposed tunnel will not be fully underground. Given that it will be raised off ground level, the promenade will overlook the active harbour and port activities.

This proposal is key to the vision: namely, to use existing and new infrastructure to create new public spaces and a people-oriented precinct that make the area welcoming and alluring.

How will the City pay for the project?

The question of funding will be addressed as the project progresses from vision to implementation.

Why is the proposed project being delivered in phases?

The proposed Foreshore Precinct Project is a complex engineering and construction project.

For example, it must be implemented incrementally as the existing freeways must keep on functioning while the construction is ongoing. Thus, the movement of the inbound and outbound traffic must be maintained as the project is being delivered.

Will the Foreshore Precinct Project affect the Port?

The Foreshore Precinct Project proposals include an area of land which falls inside the official Port boundary.

The National Ports Authority is a key stakeholder, and the City is busy engaging the authority on the project.

Has the proposed CapeTrain Express been incorporated into the Foreshore Precinct planning?

No. This is not a City proposal, neither is it part of the City’s plans.

Why do we need this project?

Cape Town is growing, but the city centre has limited space to accommodate that growth. The Foreshore is one of the few significant areas where the CBD can expand.

Around 15 hectares of land in the heart of the city have remained largely vacant or underutilised for more than 50 years because of the unfinished Foreshore Freeway scheme.

This project provides an opportunity to resolve that long-standing uncertainty and unlock the land for a new city neighbourhood.

What will happen to the unfinished Foreshore freeways?

The project proposes a phased reconfiguration of the existing road infrastructure.

Phase 1 proposes the widening of the existing inbound elevated freeway and a new inbound link bridge over Buitengracht that links the inbound elevated freeway to Helen Suzman Boulevard. For the outbound, a proposed new ramp will connect Buitengracht over Dock Road to the existing outbound freeway.

Phase 2 proposes a new bridge linking Helen Suzman Boulevard with the outbound tunnel. Should this go ahead, the proposed tunnel will be constructed on the vacant land between the Port and Customs House, from where it will continue next to Duncan Road to link with the N1. The proposed tunnel will also connect with Nelson Mandela Boulevard. Once this infrastructure is in place, the existing outbound elevated freeways will be demolished, freeing up land for the new precinct to be developed and a new tree-lined harbour promenade for people to experience the precinct in a safe and alluring outdoor environment.

The 1968 scheme for the unbuilt inner elevated freeways will be abandoned, and the existing unused elevated freeway stubs to Nelson Mandela will be demolished.

Will there be more space for pedestrians and cyclists?

Yes, this is included in the proposals.

A key part of the vision is to create a more pedestrian-oriented precinct, with narrower and calmer streets, improved crossing points, active mobility connections for cyclists, and a new tree-lined harbour promenade for people to experience the precinct in a safe and alluring outdoor environment.

The new streets will connect the existing city grid with the promenade and the harbour edge.

Does this include new buildings?

Yes. The vision is for a well-planned, mixed-use urban neighbourhood where buildings, streets, parks and public spaces fit together to create a people-oriented environment that is sensitive to and promotes Cape Town’s natural and local heritage.

The intention is that new streets with the existing streets to create key view corridors which preserve and enable views of Table Mountain from the new public spaces within the Precinct.

The proposal is to create a more connected, vibrant and liveable part of the city, while protecting what makes Cape Town unique.

What economic benefits will the Foreshore Precinct Project create?

The intention is to unlock the unutilised land in the Foreshore to create space for new residential, commercial and civic development in the heart of Cape Town’s CBD.

The vision foresees opportunities for investment, job creation, and long-term economic activity, as well as a new neighbourhood with housing opportunities.

When will construction start?

We are still a long way off from construction.

Right now, the intention is to share the City’s vision for this precinct with residents and stakeholders.

We will, in the new year, have the first of many public participation processes about key steps that are needed to realise the proposed vision. The input we receive during the public participation processes will be considered in finalising the proposals for the precinct.

The intention is to deliver the project in phases. Each phase will have a number of public participation processes for the public and stakeholders to submit comments.

Thus, in short, should all goes as planned, the first phase is anticipated to kick off in 2031.

What will happen to the existing outbound elevated freeway?

The proposal is for the existing outbound elevated freeway to remain until the proposed outbound tunnel is completed. The outbound elevated freeway and uncompleted stubs to Nelson Mandela will be demolished once the new tunnel is operational.

How will public transport then be improved or promoted by the proposals?

The proposed link bridges will remove the current high volumes of traffic from the Buitengracht/Dock Road/ Helen Suzman Boulevard intersections. This will provide additional capacity at these intersections to reduce the number of lanes in Buitengracht, thereby reducing crossing distances for pedestrians and to implement priority lanes for road-based public transport in an east-west direction.

The proposals will enable significant network improvements.

Within the Precinct itself, the proposal is to provide facilities for feeder services as the project unfolds. This will include bus stops and dedicated lanes as and where needed.

An important aspect of the City’s Integrated Public Transport Network Plan and the CBD Local Spatial Development Framework is active mobility as a key component of the public transport network planning. The public realm concept makes generous provision for covered sidewalks, a tree-planting zone, engineering services and cycle routes which connect to the existing planned CBD network, thereby enabling active mobility to cover the ‘last mile’ to destinations.

Where can people find out more or provide input?

The City will, in the new year, have the first of many public participation processes about key steps that are needed to realise the proposed vision. Please click on the ‘Get Involved’ button to register your interest.

The City will also announce the public participation processes and opportunities for engagement as these become available.

A More Connected City Starts Here

Let’s Reconnect Cape Town to its Sea

Be a part of Cape Town’s transformation.

A More Connected City Starts Here

Let’s Reconnect Cape Town to its Sea

Be a part of Cape Town’s transformation.